Skip to content

THIRD-PARTY LOGISTICS — SOUTHWESTERN ONTARIO

Their inventory. Your error rate.

The trailer is unloaded against an advance notice that does not quite match what came off it. A unit goes out wrong and comes back as a return, a chargeback and a scored miss. Count and system disagree, and finding out why means a person walking the racks. We put the check at the moment the unit is handled, so the error is caught where it is made and not billed back to you a month later.

Book a pilot call

Free · 20 minutes · no commitment

You are measured on accuracy against a count you did not create.

Every unit in the building belongs to somebody else, arrived on somebody else's paperwork, and is scored against somebody else's system. When the two disagree, it is your people who walk the racks and your margin that absorbs it. The fix is not more checking — it is checking at the moment the unit is handled, when the answer is still cheap.

The headcount you add for volume, not for errors.

Where a 3PL loses it and a manufacturer does not.

None of these are measurements of your warehouse — we have not seen it. They are the five places a third-party operation loses money that a manufacturer running the same volume would not, because none of the inventory is yours and all of the accuracy is your problem.

Billed back
is what a mis-pick becomes once the customer passes the chargeback on
Retail compliance programmes
Someone walks
the racks whenever the count and the system disagree
Hours that ship nothing and bill nothing
Never invoiced
is where re-wraps, rush pulls and rolled storage quietly end up
Accessorial work captured only if remembered
At receiving
is where an error becomes cheap or expensive, and it is usually not caught there
ASN against what actually came off the trailer
The contract
sets an accuracy number you report on but cannot see day to day
Service level agreements

Five problems, and what replaces the count that finds them too late.

Every one of these was answered with a check at the end, where an error costs the most to find and the least to prevent.

  1. 01

    What the advance notice said and what came off the trailer are two different lists, and the difference is absorbed at the door, not recorded.

    Book it in, sort it later

    Receiving is judged on how fast the door is cleared, so a discrepancy found at the dock costs the receiver time they are measured against. The rational move is to book it in and sort it out later — except later is a cycle count three weeks on, by which time nobody can say which shipment it came from.

    See the station that closes it →
  2. 02

    A unit goes out wrong, and by the time anyone knows, it is a return, a credit and a compliance charge from the customer's retailer.

    A second check at pack

    The picker was never the problem — the check was, and it sat at the end where finding an error costs the most. Adding a second check at pack slows the line without moving the error rate much, because it is the same person looking at the same label a second time.

    See the station that closes it →
  3. 03

    The cycle count says one number and the system says another, and the only way to find out why is hours on foot in the racks.

    Cycle counting

    Cycle counting samples; it does not explain. It tells you the number is wrong without telling you which movement made it wrong, so the investigation starts from scratch every time and is never quite finished before the next one.

    See the station that closes it →
  4. 04

    Re-wraps, rush pulls after cut-off, and storage that rolled into another period get done, and never appear on an invoice.

    Writing it down under pressure

    Capturing accessorial work depends on somebody writing it down while they are in the middle of doing it, usually because a customer is standing there asking for a favour. The work that is hardest to record is exactly the work done under pressure — so the busiest weeks bill the least accurately.

    See the station that closes it →
  5. 05

    The service agreement sets an accuracy and on-time number you report against monthly, and cannot see weekly.

    A monthly spreadsheet

    The data is spread across the warehouse system, the carrier's tracking and a spreadsheet somebody maintains. Assembling it is a monthly job, which means a slipping quarter is visible only once the quarter has slipped and the customer has already noticed.

    See the station that closes it →

WHAT IT LOOKS LIKE

Owner’s View

EXAMPLE FIGURES

Tuesday, 9:20 in the building

YOUR BUILDING · 4 CLIENTS · UPDATED 9:20 · SHOWN WITH LIVE REFRESH, A SEPARATELY QUOTED UPGRADE

  • Pick accuracy · this week

    99.6%

    ▲ 0.1 pts· On track

    Three mis-picks, all caught at pack.

  • Dock appointments on time

    92%

    ▼ 3 pts· Needs you

    Two carriers arrived outside their slot this morning.

  • Accessorial work not billed

    $2,140

    ▲ $310 this week· Needs you

    Re-wraps on Monday are not captured yet.

  • Inventory variance

    0.4%

    ▼ 0.1 pts· On track

    Every move recorded, so each variance comes with its cause.

Needs you today

  • Receiving vs ASN

    1 short against the ASN at door 4 · Operations

    Short
  • Client onboarding

    SKU form 80% complete · Sales & intake

    Needs you
  • Dock appointments

    2 arrived outside their slot · Operations

    Needs you
  • Forklift & incidents

    In 21 days · Quality & compliance

    Due soon
3PL & Warehousing: the owner’s week on one screen, with the four numbers that matter in this trade and what needs the owner today. The same example business as the Owner’s View demo.

Open this dashboard in the demo →

3PL & WAREHOUSING · OPERATIONS BLUEPRINT

Every process in the building. Lit where a system carries it.

Each floor is a department and each station a process. The bright line is the path one job takes, and the light travelling it is that job. Select any station to see what starts it, what the system does, and what stays with a person.

run on the system
9run on the system
keep a person at the gate
1keep a person at the gate
built only for a pilot
0built only for a pilot
added by you
0added by you
01Work arrives02Somebody promises it03Somebody does it04The customer is told05The money is collectedSALES & INTAKECUSTOMER SERVICEOPERATIONSQUALITY & COMPLIANCEFINANCEBACK OFFICE & REPORTINGClient onboardingDock appointmentsReceiving vs ASNPick & pack accuracyInventory movementsForklift & incidentsOrder statusAccessorial billingStorage invoicingWeekly KPI page
All 10 stations as a list

YOUR ADDITIONS · THE MAP IS YOURS TO EXTEND

Missing a process? Put it on the map.

Anything you run, or wish you ran, that is not drawn above. Name it, say where it sits, and it appears on the model with a blueprint sheet of its own. It travels with your pilot-call booking, so the call starts from your map, not ours. No price is attached; it is scoped on the call.

Start from

Who decides

Kept in this browser. Sent only if you book a call, or ask for its plan.

Blueprint sheet · live preview

APPROVESCHEDULEDPOSTED · EACH CHANNEL

Marketing · Work arrives · A person approves each one

Social media automation

A poster is drafted from the week's work, a person approves it, and it is scheduled and posted to each channel on a calendar.

Starts when
A week's work is done, or a date on the calendar arrives.
The system
The poster and caption are drafted from it and queued.
A person
A person approves each one before it goes out.
On record
Every post, its channel, and when it went out.
Book a pilot call

Twenty minutes. No deck.

What this does not do

  • It does not replace your warehouse system. It puts a check next to it, where the unit is handled.
  • It will not fix an error your customer's own data created. A wrong ASN is wrong before it reaches you — but you will be able to prove that.
  • It does not count for you. It tells you which movement made the number wrong, so the count is shorter.
  • It does not decide what to bill. It captures what was done and puts the list in front of whoever prices it.
  • A Diagnostic is measured against your numbers — your error rate, your accuracy against contract, your unbilled work.

This page is written from the fundamentals we run on our own fleet — receiving, proof, billing — and from how third-party warehousing is contracted, not from a 3PL client. The board above describes mechanisms, not measurements, and every figure the calculator shows is your own.

WHY US

We run this on our own vehicles.

We are not a consultancy that read about AI and wrote a deck. We build and operate the automation behind our own Ontario transport operation — built inside our own business first — and it runs every day whether or not anybody is watching it.

  • Vehicles tracked by geofence on the 401 corridor.
  • Arrival and departure times recorded without anyone typing them.
  • Delay alerts that hold their tongue until they are certain.
  • An AI voice agent that calls drivers before an early start.
  • A dispatch desk that runs on all of it.

That operation moves people on vehicles; yours moves goods through a building. Dispatch and tracking transfer directly. The warehouse floor does not, and we say so.

What transfers is the machinery, and the expensive mistakes that come with it. The vehicle that clipped a geofence while driving past and marked a stop it never made. The stale data feed that hid whole trips. The alert that fired on one bad GPS reading. Every one of those is a way an automated system embarrasses you in front of a customer, and every one was found and fixed on our vehicles, not yours.

If this is your week, twenty minutes settles whether a Diagnostic would find anything worth fixing.

Book a pilot call

Run it against your own building.

How many orders you handle a month, how many go out wrong, what one costs you once the credit and the chargeback land, and how much work leaves the building without reaching an invoice. The calculator works from those and nothing else.

OPEN THE 3PL LEAK CALCULATOR →

QUESTIONS WE GET ASKED

What happens when the trailer does not match the advance notice?

What actually comes off the trailer is matched to the notice at the door, so a discrepancy is raised while the trailer is still there and the shipment it belongs to is not in question — instead of surfacing at a cycle count three weeks on.

How do you cut pick errors without a second check at pack?

By matching the unit to the order at the moment it is handled, not inspecting it again at the end. A second check at pack slows the line without moving the error rate much, because it is the same person looking at the same label again.

Can it tell me why the count and the system disagree?

Yes. Every movement is recorded where it happens, so a variance arrives with the movement that caused it attached, and the walk is a check, not a search. It does not count for you; it makes the count shorter.

Does it capture re-wraps, rush pulls and rolled-over storage?

The work is captured as it is performed, not reconstructed at month end, so what leaves the building and what appears on the invoice are the same list. It does not decide what to bill — it puts the list in front of whoever prices it.

Does it replace my warehouse system, and how does it start?

No. It works on top of what you already run, not instead of it. It puts a check next to your warehouse system, where the unit is handled, and it cannot fix an error a customer's own ASN created — but you will be able to prove that. The first engagement is an Operations Diagnostic of the whole business, with one number taken from the part that costs most, measured against your error rate, your accuracy against contract and your unbilled work.

Bring us one bad week.

Book a pilot call. Tell us where the week goes wrong, and we’ll tell you what an Operations Diagnostic would map and measure.

The first paid step has a clear scope and an end date, and the pilot after it is one workflow — not a platform, and not an open-ended retainer.

Free · 20 minutes · no commitment